Carpinteria Salt Marsh Reserve
27 Feb, 08 AM - 27 Feb, 06 PM
During this visit, my team and I will employ a total station to measure channel depths along a cross sections of the main channel running NW from the end of Estero Rd towards the mouth of the estuary and deploy sediment traps. This will take 2 days to complete. The first day, I will measure the depths along the channel cross section and deploy the sediment traps near the poles that I installed during my last visit. This will all be done during low tide. The second day, also during low tide, I will retrieve the sediment traps.