Carpinteria Salt Marsh Reserve
14 Jun, 07 AM - 16 Jun, 06 PM
The proposed fieldwork includes in-situ measurement of methane emissions and sediment sampling. An emission chamber (i.e., modified plastic box) will be deployed in the hypersaline pool and along the channel for several hours, which is connected to a portable greenhouse analyzer to quantify the methane emission rate from the underlying sediments. Push cores will be sampled in the hypersaline pool, freshwater sites and in the channel close to the entry of the CSMR, respectively. The upper 5 cm of sediments at these two sites will be collected separately in a 250 ml bottle.
Approved
Visitor List
Graduate Student
Jun 14, 2021 (1 days)
Faculty
Jun 14, 2021 (1 days)
Graduate Student
Jun 14, 2021 (1 days)
Graduate Student
Jun 15, 2021 (1 days)
Faculty
Jun 15, 2021 (1 days)
Graduate Student
Jun 15, 2021 (1 days)
Graduate Student
Jun 16, 2021 (1 days)
Faculty
Jun 16, 2021 (1 days)
Graduate Student
Jun 16, 2021 (1 days)
Amenities
Day Use Only
3
Jun 14 (11 hours)