Carpinteria Salt Marsh Reserve
31 Jan, 09 AM - 01 Feb, 07 PM
The proposed fieldwork includes in-situ measurement of methane emissions and sediment sampling. An emission chamber (i.e., modified plastic box) will be deployed in the hypersaline pool and along the channel for several hours, which is connected to a portable greenhouse analyzer to quantify the methane emission rate from the underlying sediments. Push cores will be sampled in the hypersaline pool, and a marine site in the channel close to the hypersaline pool, respectively. The upper 5 cm of sediments at these two sites will be collected separately in a 2L bottle.
Approved
Visitor List
Graduate Student
Jan 31 - Feb 1, 2022 (2 days)
Graduate Student
Jan 31 - Feb 1, 2022 (2 days)
Undergraduate Student
Jan 31 - Feb 1, 2022 (2 days)
Amenities
Day Use Only
3
Jan 31 - Feb 1, 2022